Data Import from Open Plan
Use the Integration Wizard to import data from Open Plan into Cobra.
Demonstration data is provided in both the Cobra and Open Plan applications. You can use this data to help you learn about the Cobra/Open Plan linking function. The Open Plan installation includes a demonstration project named Ship that when restored can be linked to Cobra.
- Related Topics:
- Prepare the Open Plan Schedule
Preparing the Open Plan schedule involves all or some of the following elements: file format, identifying the link, resources and structures. - Resource-Loaded Schedule
Cobra uses the value in the Resource Assignment Level field from the schedule as the value for the base or first result when linking with a resource-loaded schedule. - Load Resource Files from Open Plan
A resource code file originating from Open Plan can be brought into Cobra. You can use a punctuated significant breakdown structure for resource codes in Open Plan and a non-significant breakdown structure for resource assignments in Cobra. - Turn On the Opening % Feature When Integrating with Open Plan
Use this procedure to load the Opening % from Open Plan activities to Cobra work packages. If you do not follow this procedure, the Opening % will not be loaded from Open Plan to Cobra when activities and work packages use the User Defined progress technique. - Run the Integration Wizard
You must complete the information required on each page of the Integration wizard.
Parent Topic: Data Import Using Scheduling Tools