Positive and Negative Lags and Leads
This type of analysis pinpoints all relationship links that are carrying a lag.
Negative lags (or leads) cause concern within a schedule as they can lead to reverse logic. Likewise, positive lags often result in detail being lost within a schedule during statusing / execution.