Use the commands in this group to perform such tasks as copy the results to the clipboard, refresh metric libraries and analysis, and include exclusions.
Field | Description |
Copy to Clipboard
|
Select this command to copy the Fuse Schedule Index and metrics to the clipboard so that you can paste it into another application.
|
Refresh Libraries
|
The libraries are dynamic and the information can change. Select this option to load the metric libraries used for benchmarking from the cloud to make sure that local copies are in sync.
|
Include Exclusions
|
On the S1 // Projects tab, you can choose to exclude projects from analysis by selecting the check box next to each project in the Projects pane. Select this command to include all excluded projects in the benchmark analysis.
|
Refresh Analysis
|
Select this command to re-analyze the information. You may want to do this if you have changed a setting or refreshed the libraries.
|