Open topic with navigation
From
The earliest date to apply the selected DPE/overhead distribution method
Through
Required. The latest date to apply the selected DPE/overhead distribution method
Distribute
Distributes DPE and overhead based on the distribution method selected in Company > Preferences for the date range specified in this window