| Field | Description |
| Hour
|
Select the number of decimal digits for hours in plans.
|
| Quantity
|
Select the number of decimal digits for quantities in plans. By default, Vision sets all percentages and multipliers to
2 Digits.
|
| Amount
|
Select the number of decimal digits for amounts in plans. When the amount is set to
Currency, all amounts will follow the decimal digit setting of the currency unit of that amount.
By default, Vision sets all Labor Rates and Unit Rates to
Currency.
|
| Create Plan from Project
|
Select the amount of detail to copy when using the
or
menu items on the Project Planning toolbar.
Options are to copy down to:
-
Project — Select this option to include project information when you copy an existing plan.
-
Phase — Select this option to include project and phase information when you copy an existing plan.
-
Task — Select this option to include project, phase, and task information when you copy an existing plan.
-
Labor Code — Select this option to include project, phase, task, and labor code information when you copy an existing plan.
|
| Plan Compensation Values By Row & Period
|
When you select this option, the following areas are affected in Project Planning.
|
| Synchronize Fees from Plan to Project
|
Select this option to synchronize all of a plan's compensation to its project when saving the plan. If you select the
Synchronize fees from Plan to Project option, you cannot select the
Synchronize fees from contract to project option on the General tab of Accounting System Settings.
This option does not apply to iAccess for Vision plans.
|
| Limit Plan Fees to Contract Totals
|
Select this option to limit the plan compensation amounts at the WBS1 level by the amounts entered in the Contract Management tab of the Project Info Center. This includes the
Compensation,
Direct Consultant, and
Reimbursable amounts in Project Planning.
If you also select the
Exact decimal limits option, Vision verifies that the planned amount does not exceed the contract amount by more than 0.5 (applicable currency). If the planned amount exceeds the contract amount by more than the applicable currency, Vision limits the amount to exactly the contract amount, down to the decimal amount.
|
| Exact Decimal Limits
|
Select this option to verify that the planned amount doesn’t exceed the contract amount by more than 0.5 (applicable currency). If the planned amount exceeds the contract amount by more than the applicable currency, Vision limits the amount to exactly the contract amount, down to the decimal amount.
This option does not apply to iAccess for Vision plans.
|
| Auto Insert Resources into Plan
|
Select this option to set the default to automatically insert a project's resources and actuals into a plan. Resources may include employees, expenses, consultants, and/or units.
Before you select this option, it is necessary to consider your plan's WBS structure and whether or not the project has a mapped plan. Automatically inserting resources and actuals may result in unexpected changes to your plan. For this reason, it is important to decide if you want to insert in the plan's existing structure or at the lowest matching WBS level.
When you select to auto insert resources into the plan, you can then specify how the resources are handled:
- Insert Missing WBS Levels, Resources, and Actuals — Select this option to insert the required WBS levels, map them, and then insert the resource. For consultant, expenses, and units resources, this also inserts the General Ledger account number and vendor.
- Insert Resources and Actuals at Lowest Matching WBS Level — Select this option to insert the resource and actuals at the lowest matching mapped level. For consultant, expenses, and units resources, this also inserts the General Ledger account number and vendor.
|
| Default Settings for Creating a New Plan
|
Use these options to specify the default settings that display on the General tab of Project Planning.
Even though you establish the initial default settings, users may modify and override those settings. For example, when you select the
Include in Utilization and Project Reports option, that same option displays on the General tab of Project Planning. The user may remove the selection on that option. When the user saves the plan, Vision saves the option specified by the user.
|
| Starting Day of the Week
|
Select the day of the week on which business starts.
This option does not apply to iAccess for Vision plans.
|
| Planned Revenue
|
Use these fields to calculate revenue based on planned labor, expense, and consultant information.
This option does not apply to iAccess for Vision plans.
|
| Labor Multiplier Type
|
The options for this field depend on the
Budget Type entry on the Rates tab.
If the
Budget Type is set to
Cost and Billing, the
Labor Multiplier Type defaults to
User Entered (Cost) and the options list displays:
-
User Entered (Cost)
-
Planned Multiplier
-
User Entered (Billing)
-
Planned Ratio
If the
Budget Type is set to
Cost:
- The
Labor Multiplier Type defaults to
User Entered (Cost), which is the planned labor cost amount, and the options list displays
User Entered (Cost) and
Planned Multiplier.
- The
Planned Multiplier that displays on the Analysis tab is calculated as follows:
Planned Total Compensation (Compensation + Consultant Fee + Reimbursable Allowance) - Direct and Reimbursable Expenses/Planned Labor Cost
If the
Budget Type is set to
Billing:
- The
Planned Multiplier defaults to
User Entered (Billing), which is the planned labor amount at billing value, and the options list displays
User Entered (Billing) and
Planned Ratio.
- The
Planned Ratio that displays on the Analysis tab is calculated as follows:
Planned Total Compensation (Compensation + Consultant Fee + Reimbursable Allowance) - Direct and Reimbursable Expenses/Planned Labor Billing
If you are using iAccess for Vision, all iAccess for Vision plans are set to
Planned Ratio.
|
| Multiplier
|
If the
Labor Multiplier Type is set to
User Entered (Cost) or
User Entered (Billing), you can enter a value in this field to specify the
Multiplier.
If the
Labor Multiplier Type is set to
Planned Ratio or
Planned Multiplier, this field displays the
Planned Ratio or
Planned Multiplier, as calculated on the Analysis tab.
This option does not apply to iAccess for Vision plans.
|
| Reimbursable Method
|
Select the Reimbursable Method that you want to use to display project revenue from reimbursable expenses and consultants. If using iAccess for Vision, all iAccess for Vision plans are set to Billing.
|
| % Complete Formula
|
Select the percent complete formula to be used as the default for plans. This option is available only with the proper configuration settings on the Planning tab of Role Security.
If you are using iAccess for Vision, all iAccess for Vision plans are set to
JTD/(JTD + ETC).
|
| Overhead %
|
Enter the overhead percent applied to the project.
|
| Include in Utilization and Project Reports
|
Select this option if you want the
Include in Utilization and Project Reports option to display on the General tab of Project Planning.
When users select the
Include in Utilization and Project Reports option, Vision includes the current plan when running Planning reports and Resource Management searches.
If you are using iAccess for Vision, all iAccess for Vision plans are included in utilization.
|