This section includes the fields and descriptions for the Print Planning Conflicts tab.
Selection Criteria Island
Field | Description |
Job No.
|
In these fields, you can enter a range of job numbers. The printout will only include conflict information on jobs within the specified range.
|
Project Manager No.
|
In this field, you can enter the number of a project manager. The printout will only include conflict information for jobs to which the specified project manager is assigned.
|
Date
|
In these fields, you can enter a range of dates. The printout will only include resource allocations within the specified date range.
|
Planning Unit
|
In this field, you can select a planning unit (day or week). The printout will group conflict information for each job by the specified time unit.
|
Print Control Island
Field | Description |
Layout
|
In this field, you can select which layout to use for the printout. If no additional layouts for the current printout have been added in the window Print Layout in the Set-Up module, “Standard” is the only option.
|
Min. Load %
|
In this field, you can enter a load percentage. The printout will only include employees with a potential load percentage above the specified percentage.
|
Include Preliminary Conflict Bookings
|
In this field, you can choose whether or not conflicting allocations of the booking type “Preliminary” should be included in the report.
|
Include Requested Conflict Bookings
|
In this field, you can choose whether or not conflicting allocations of the booking type “Requested” should be included in the report.
|
Include Confirmed Conflict Bookings
|
In this field, you can choose whether or not conflicting allocations of the booking type “Confirmed” should be included in the report.
|