Use the fields and options to select a
labor code to which you are charging time on a timesheet.
Field | Description |
Search fields and list boxes for each level of a
labor code
|
The search fields at the top of the dialog box each correspond to a labor code level. Below each search field is a list box with the codes for that labor code level. The number of codes found for a labor code level displays below the search field.
If, instead of the search field, the
Filter Budgeted Levels check box displays above the list and is selected, that indicates that only
labor codes for which you are budgeted for the
project are available in the list. You can clear this check box and select from all of the
labor codes for the level if the
Budgeted Validation field on the Time & Expense tab in the
Project hub in the web application is set to
Warning. If the
Budgeted Validation field is set to
Error, then the filter check box is disabled and you can only select from the displayed short list of values.
|
Select
|
Click this button to select the
labor code and return to the Timesheets form.
|