Costpoint Help

Configure Shop Floor Calendar

Use the Configure Shop Floor Calendar screen to set up a shop calendar for a specified range of calendar days.

If you selected the Shop Days option on the Configure Production Control Settings screen, the system will use the shop calendar for material lead time and capacity planning.

Use this screen to set up the shop floor calendar and to make modifications as required. Do not use this screen if you did not select the Shop Days option on the Configure Production Control Settings screen.


Display the Configure Shop Floor Calendar Screen

You access the Configure Shop Floor Calendar screen from the Materials domain.

Contents of the Configure Shop Floor Calendar Screen

Use the fields and options to configure the Configure Shop Floor Calendar screen.

Table Information for the Configure Shop Floor Calendar Screen

Changes to the Configure Shop Floor Calendar screen update the SHOP_CALENDAR table.


Parent Topic:

Production Control Controls