Update Low-Level Codes

Use this screen to perform three functions, depending on which check box you select: Update Low Level Code, Check for Looping Parts, or Change Selected Parts from No Planning Option to MRP Planned.

Convert MO Status from Planned to Firmed Planned

If you are using Costpoint Production Control, run this toolkit before implementing Costpoint Material Requirements Planning.

Update Netting Flags for MRB Locations

Use this toolkit to update the inventory netting flag for MRB locations, depending on whether or not you have selected the Incl MRB as Available Inventory check box on the Configure Production Control Settings screen in Costpoint Production Control.

Assign Planning Warehouses to Inventory Projects

Use this toolkit to assign a warehouse to a range of selected projects.

Assign Project Planning Warehouses to Req and PO Lines

Use this screen if MRP planning is to be done by warehouse.

Create Reservations for Pending Sales Orders

This toolkit creates reservations for all inventory sales order lines that are not yet approved and should be run only if you generated sales orders before installing Costpoint Material Requirements Planning.

Create MRP Detail Report Table

Use this toolkit to populate a report detail table from MRP gross requirements and scheduled receipts.