Costpoint Help

Configure Advanced Planning and Scheduling Parameters

Use the Configure Advanced Planning and Scheduling Parameters screen to modify the parameters used to download Manufacturing Order (MO) and Work Center information from Costpoint into the RSS Advanced Planning and Scheduling (APS) system.


Display the Configure Advanced Planning and Scheduling Parameters Screen

You access the Configure Advanced Planning and Scheduling Parameters screen from the Materials domain.

Contents of the Configure Advanced Planning and Scheduling Parameters Screen

Use the fields and options to configure the Configure Advanced Planning and Scheduling Parameters screen.

Table Information for the Configure Advanced Planning and Scheduling Parameters Screen

Changes to the Configure Advanced Planning and Scheduling Parameters screen update the CAP_PLAN_SETTINGS table.


Parent Topic:

Production Control Interfaces