UDT03 Links Tab of the UDT09 Screen
In stand-alone Time & Expense installations, use the UDT03 Links tab of the UDT09 screen to add, edit, or delete UDT03 links.
UDT03 Direct Links Subtask
Linking of an Org ID and Labor Location / Local (link 93) is not supported in co-deployed systems, so the Direct and Wildcard subtasks links do not display
Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of
. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.
Note: If your version of Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only, because modifications must be applied directly to the appropriate area within Costpoint.
Field | Description |
---|---|
UDT03 |
This column displays the currently linked UDT03. |
Description |
This column displays the currently linked UDT03 description. |
UDT03 Table Wildcard Links Subtask
Field | Description |
---|---|
UDT09 |
This column displays the currently linked UDT09. |
UDT03 |
This column displays the currently linked wildcard UDT03. |
Description |
This column displays the currently linked UDT03 description. |
Parent Topic: UDT09S