UDT01 Links Tab of the UDT09 Screen

Use the UDT01 Links tab of the UDT09 screen to manage UDT01 links.  

If Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only and modifications must be made directly within Costpoint.

Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of Configuration > General Controls > Configure General Settings. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.

UDT01 Direct Links Subtask

Note: This table is not editable when Time & Expense is co-deployed with Costpoint.
Field Description
UDT01

This column displays the currently linked UDT01s.

Description

This column displays the currently linked UDT01 descriptions.

UDT01 Wildcard Links Subtask

Field Description
UDT09

This column displays the currently linked UDT09.

UDT01

This column displays the currently linked wildcard UDT01.