UDT09 Direct and Wildcard Links Subtasks
Use the UDT09 Direct and Wildcard Links subtasks of the Manage UDT01S screen to add and/or delete UDT09 links.
If Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only and modifications must be made directly within Costpoint.
Each link tab displays a table of the linked items of the current UDT01. Different column headings and data display in the table, depending on whether you are using Direct or Wildcard links.
Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of
. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.
UDT09 Direct Links Subtask
Note: This table is not-editable when Time & Expense is co-deployed with Costpoint.
Field | Description |
---|---|
UDT09 | This column displays the currently linked UDT09s. |
UDT09 Description | This column displays the currently linked UDT09 descriptions. |
UDT09 Wildcard Links Subtask
Field | Description |
---|---|
UDT01 | This column displays the currently linked UDT01. |
UDT09 | This column displays the currently linked wildcard UDT09s. |
Options | Click Options to display additional wildcard examples. |
Parent Topic: UDT01S