Use this subtask to copy an Manufacturing Bills of Material (MBOM) from another assembly part/revision.
If the Action Code in the main screen is Change and you use this subtask, the EBOM components will populate the table window, but the Action Code for each component line will be blank. If the Action Code in the main screen is Add, Replace, New Revision, or Obsolete, the Action Code for each component line will be Add.
Enter, or click to select, the assembly part from which you want to copy component parts.
Enter, or click to select, the assembly part revision from which you want to copy component parts.
This field displays the description associated with the selected part.
Enter, or click to select, the as-of effective date of the BOM for which you want to pull components. Only those components that are effective as of this date will be copied.
Enter, or click to select, the EBOM configuration for which you want to pull components. If you make an entry, only those components valid for the specified configuration will be included. This field is hidden if you did not select the Use Configuration IDs check box on the Configure Bills of Material Settings screen in Costpoint Bills of Material.
Click this button to copy all MBOM components from another part.
Click this button to copy all MBOM components that are in effectivity from another part.