PLC DEFAULTS

Use this subtask to set up the default project and Project Labor Category (PLC) for the labor operation.

PLC Defaults

Project

Enter, or click to select, a project to which you want to assign a default PLC.

Project Labor Category

Enter, or click to select, the PLC for this labor operation. The PLCs in the lookup are those that are assigned to the specified project.

PLC Description

This field displays the corresponding description for the PLC that you specify in the PLC field.