Use this subtask to set up the default project and Project Labor Category (PLC) for the labor operation.
Enter, or click to select, a project to which you want to assign a default PLC.
Enter, or click to select, the PLC for this labor operation. The PLCs in the lookup are those that are assigned to the specified project.
This field displays the corresponding description for the PLC that you specify in the PLC field.