Use this subtask to view work centers that can be used in place of the designated work center.
This field displays the work center at which the labor operation is being performed. This value is populated from the routing if you use the Autoload feature. If the line is new, this value is populated from the Operations menu screens in Costpoint Routings. To modify this field, enter a work center or use to select one.
This field displays the description of the operation. This value is populated from the routing if you use the Autoload feature. If the line is new, this value is populated from the Operations menu screens in Costpoint Routings.
This field displays the process type code for this routing. If the line is new, this will default in from the work center or the Operations menu in Costpoint Routings, depending upon your selection in the Routing Primary Default Source group box on the Configure Routing Settings screen.
This field displays the description of the type of the work center selected.
Click this button to load entries into the table window.