Field Descriptions

Table Information

Modifications

What can I do in this tab?

Use this screen to enter all modifications for signed and funded value, as well as period of performance. You should enter the initial signed and funded value for a project against Modification "0000." Modification numbers other than "0000" will not be treated as original value for reporting purposes.

When should I use this tab?

Use this screen to enter the initial signed value, funded value, and period of performance for a project. Then you need to use it only to update modifications to signed or funded value, or to the period of performance.

Field Descriptions

Modification ID

Enter up to 10 alphanumeric characters for the project modification number. As long as numerals are used in the beginning or end of the modification number, the system will provide a default of the last modification number for the project plus one. If no modification numbers are found, it will default to "0000." After you save the record, this field is non-editable.

Note: The size of the initial modification number that is used will also determine the size of all modification numbers for the project (i.e., if you assign a modification number of "A1" as the first number, you will run out of modification numbers after "A9" because the system will treat "A10" the same as "A1").

Description

Enter up to 30 alphanumeric characters for the description of the modification.

Period of Performance

Start Date

Enter, or use Calendar Lookup to select, the start date of the project. The start date of the project is generally in the contract.

End Date

Enter, or use Calendar Lookup to select, the end date of the project.

Value Modifications

Value

This field will display either a user-supplied signed value for the project or a system-calculated signed value, which is derived by using the Cost, Fee, and Fee % fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Fee %

This field will display either a user-supplied fee % for the project or a system-calculated fee %, which is derived by using the Value Modifications Cost, or Value Modifications Fee fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Cost

This field will display either a user-supplied signed value for cost for the project, or a system-calculated cost value, which is derived by using the Fee, Fee %, and Value fields. The calculation varies depending on which two of the three variables has been entered. At least two variables must be entered for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Fee

This field will display either a user-supplied signed value for fee for the project, or a system-calculated fee value, which is derived by using the Current Cost, Current Fee, and Value fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Funding Modifications

Value

This field will display either a user-supplied funded value for the project, or a system-calculated funded value, which is derived by using the Funding Value Current Cost, Funding Value Fee %, and Funding Value Current Fee fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Fee %

This field will display either a user-supplied funded fee for the project, or a system-calculated funded fee, which is derived by using the Cost, Fee %, and Value fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Cost

This field will display either a user-supplied funded value for cost for the project, or a system-calculated cost value, which is derived by using the Cost, Fee %, and Value fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Fee

This field will display either a user-supplied funded value for fee (or profit) for the project, or a system-calculated fee value, which is derived by using the Cost, Fee %, and Value fields. The calculation varies depending on which two of the three variables has been entered. You must enter at least two variables for any calculation to take place.

If you enter a value (other than "0.00") here, it will not be recalculated regardless of any changes made to the other three variables. If you enter "0.00" (or no value), the value of this field will be recalculated based on entries made to the other three variables.

Table Information

Changes to this screen update the QPROJ (Quick Project Setup) table.