Field Descriptions

Table Information

 

Linked GLCs

What can I do in this screen?

This non-editable screen displays the linkage between the General Labor Categories (GLCs) and Project Labor Categories (PLCs) for a specific project. You must have assigned the GLC to the PLC in the Assign PLCs screen before you can view it here. Once you have linked a PLC to a GLC, the PLC will display on the timesheet during timesheet entry. This can streamline the timesheet entry process.    

When should I use this screen?

Use this non-editable screen whenever you want to view the linkage between the GLCs and PLCs for a specific project.

Field Descriptions

Linked GLCs

PLC

This field displays the PLCs that have been assigned to the project.

PLC Description

This non-editable field displays the description of each PLC.

GLC

This field displays the GLC linked to the PLC.

GLC Description

This non-editable field displays the description of each GLC.

Table Information

This screen retrieves information from the PROJ_LAB_CAT_MAP (Project Labor Category Mapping) table.