This non-editable screen displays the linkage between the General Labor Categories (GLCs) and Project Labor Categories (PLCs) for a specific project. You must have assigned the GLC to the PLC in the Assign PLCs screen before you can view it here. Once you have linked a PLC to a GLC, the PLC will display on the timesheet during timesheet entry. This can streamline the timesheet entry process.
Use this non-editable screen whenever you want to view the linkage between the GLCs and PLCs for a specific project.
This field displays the PLCs that have been assigned to the project.
This non-editable field displays the description of each PLC.
This field displays the GLC linked to the PLC.
This non-editable field displays the description of each GLC.
This screen retrieves information from the PROJ_LAB_CAT_MAP (Project Labor Category Mapping) table.