Field Descriptions

 

 

Project Non-Contiguous Ranges

What can I do in this subtask?

Use the table window in this subtask to define the non-contiguous range of projects that you want to include on the report.   You can combine the features of non-contiguous selection, contiguous ranges, and single projects.  You can also use the "From Beginning" and "To End" capabilities. This allows maximum flexibility for non-contiguous project selection.

When should I use this subtask?

Use this subtask when you have selected the Non-Contiguous Range checkbox on the main screen.

Field Descriptions

Range Type *

Use this drop-down box to select the option for this line in the table window. You can use as many lines in the table as are necessary to complete the non-contiguous selection. The following options are available:

Starting Project

Enter, or use Lookup to select, a starting project for the range that you want to include in the report.

If you select "One," "Range," or "To End," in the Range Type field, you must enter a project number in this field.

If you select "All" or "From Beginning" in the Range Type field, this field will be inactive.

Ending Project

Enter, or use Lookup to select, an ending project number for the range that you want to include in the report.

If you select "All," "Range," or "From Beginning" in the Range Type field, you must enter a project number in this field.

If you select "One" or "To End" in the Range Type field, this field will be inactive.

* A red asterisk denotes a required field.