Field Descriptions

Table Information

FAQs

 

Setup Information

What can I do in this tab?

Use this tab to enter the billing formula and the retainage requirements.   The billing formula and retainage requirements that are entered in this tab will apply to every level of the bill that is below the project level identified in the Identification box.  

Two billing calculation value fields are available for entry of additional information needed for specific billing formulas.   A description of the information needed will display to the left of the billing calculation value field once a billing formula has been selected.   

When should I use this tab?

Set up this tab before you calculate bills or enter manual bills.  You cannot enter manual bills or calculate bills if you have not set up a record in this screen.  

The posting programs in the system automatically update the Open Billing Detail screen (Projects\Maintain\Billing) with posted transactions if a transaction based billing formula exists in this screen.  You cannot calculate bills if transactions have not been posted to the Open Billing Detail table.

You can change the information in this screen at any time but if you have unposted bills in the Edit Standard Bills  screen (Projects\Transactions\Billing) you must recompute them in order for the changes to take affect.

FAQs

Can I base the retainage on funded value for one tasks and contract value for another?

You can base retainage on funded value for one task and contract value for another task if you have set up the project to accommodate billing at the second level or below.

Where do the post billings programs post the unbilled portion when there is retainage?

The unbilled portion of the billing journal will be posted to the account in the project account group that has a function code of "Unbilled Genl."  If the bill that is posted contains retainage then the amount of the retainage will be posted to the account from the project account group that has a function code of "Unbilled-retainage."  The posting processes will display an error message if the project account group does not contain an account that has been assigned a function code of "Unbilled - Retainage."

The billing programs post the amount of the bill to the account that has a function code of "Billed A/R" in the project account group.

Field Descriptions

Billing Details

Use the tabs in this block to enter setup information, controls, formats, 1443 info, and other info.

Setup Information

Use the fields in this tab to enter information for billing formula and retainage calculations.

Billing Formula

Use the fields in this group box to select a billing formula and enter any billing calculation values.  Depending on the billing formula that is selected, labels will display to the left of the billing calculations value fields to define additional information needed for the formula.

Formula

Use the drop-down box to select the billing formula that applies to this project. This billing formula is used to calculate the bill for the project.

There are two types of billings, transaction-based and manual.

The following is a list of the available billing formulas:

Billing Calculation Values are located directly below the formula drop-down box and will be disabled unless the selected billing formula requires additional information, such as a fee percentage, fee per hour, or multiplier rate. Enter the fee or rate for the billing formula here.

Note: The titles of these fields will change, depending on the billing formula chosen in the Formula drop-down box.

Include Labor Multiplier in Billing Rate

Select this checkbox when you have selected a billing formula that uses a multiplier and want to include the labor multiplier in the billing rate.    

This checkbox is available only if you select "Labor Cost times Multiplier Plus Non-Labor Times Multiplier (Hours)" or "Rate Schedule Times Multiplier Plus Non-Labor Cost Times Multiplier" in the Formula drop-down box.

Retainage

Use the fields in this group box to specify how retainage amounts, or withholding amounts, will be calculated for this project's billings.

Basis For Calculation

Use the drop-down box to select the basis for the system-calculated retainage. It can be based on the total bill amount, the fee amount, or the T&M labor portion of the billing. Select "None" if you do not want retainage for this project's billings.

Withhold On

Use this drop-down box to calculate the retainage for each billing or as a final amount.

Valid options are "Each," "Final Based On Contract Value," or "Final Based On Funded Value." If you select either "Final Based On Funded Value" or "Final Based on Contract Value," the system calculates the bill and then applies the billing amount to retainage, once the amount billed exceeds the contract value less the retainage amount (retainage amount = retainage percentage multiplied by the contract value) When you post this bill, it changes the unbilled from general to retainage.

If you select "Final Based on Funded Value" or "Final Based on Contract Value," you must designate a fee ceiling of "B" (Billings) or "A" (Both Revenue and Billings) in the Value Info group box of the Project Total Ceilings screen. Without the billing ceilings, the system will be unable to calculate retainage on a "Final Amount" basis.

Note: The system will not calculate the retainage on a final bill if the retainage is based on the T&M labor portion of the billing.

Percentage

Enter the percentage to use for retainage amounts calculation, if the system has been set up to calculate retainage amounts.

Maximum Amount

Enter the maximum amount, or ceiling, of the retainage that can be withheld.

* A red asterisk denotes a required field.

Table Information

Changes to this table update the PROJ_BILL_INFO (Project Billing Information) table.

Top of Page