ROUTING LINES

Use this subtask to view all routing lines for the selected routing.

Part

This non-editable field displays the part number for which the routing was selected. The associated part description displays in the untitled field below.

Rev

This non-editable field displays the revision level of the selected part, if applicable.

Configuration Identifiers

As-Of Date

This optional field displays the as-of effectivity date, if selected.

Config

This optional field displays the configuration ID, if selected.

Company

This non-editable field displays the company ID.

Primary Routing

This field displays "Y" (Yes) or "N" (No) to indicate whether this is the primary routing.

Routing

This non-editable field displays the routing number of the selected routing.

Desc

This non-editable field displays the description of the selected routing.

Status

This non-editable field displays whether the routing is "Released" or "Unreleased."

Table Window

Operation Sequence

This field displays the operation number of the routing step.

Alternate Operation

This field displays the alternate operation number.

Step

This field displays the step number of the operation.

Step Type

This field displays the type of routing step: "S" (Standard), "C" (Cost Only), or "P" (Capacity Planning Only).

Operation

This field displays the code of the labor or subcontractor operation being performed on the routing step.

Operation Type

This field displays the operation type code for the selected operation code.

Labor/Subcontract

This field displays the usage code, based on the selected operation code.

Description

This field displays the description of the selected operation code.

Work Center

This field displays the ID of the work center associated with the selected operation code.

Process Type

This field displays the process type associated with the selected operation code.

QC Step

This field displays whether the operation is a quality control operation that requires QC, in the Shop Floor Control Menu of Costpoint Production Control.

SFC Step

This field displays whether the operation requires users to record completion in the Shop Floor Control Menu of Costpoint Production Control.

Effective Starting Date

This field displays the date on which the routing step becomes effective.

Effective Ending Date

This field displays the date on which the routing step becomes ineffective.

Run Type

This field displays the default value that determines how run hours are calculated based on the operation selected: "V" if run hours are calculated on a per-unit basis or "F" if it is not based on order size.

Unit Run Hours

This field displays the number of operation hours it takes to complete one unit in the routing step.

Operation Released

This field displays whether or not the routing step is released.

User Defined Label 1, User Defined Label 2, User Defined Label 3

These columns display only if user-defined information was set up in the Routings Settings screen.

Entry User

This field displays the ID of the user who initially entered this routing operation.

Entry Date/Time

This field displays the date and time this routing operation was entered.

Change User

This field displays the ID of the user who changed this routing operation after it was initially entered.

Change Date/Time

This field displays the date and time this routing operation was changed.

WC Notes

This field displays notes pertaining to the selected routing line.

Detail

Select this pushbutton to open the Detail subtask, where you can view additional detail on the selected Routing line.

Labor Op

Select this pushbutton to open the Labor Operation subtask, where you can view additional detail about this labor operation. This pushbutton is disabled if the line is a subcontractor operation.

Subct Op

Select this pushbutton to open the Subcontractor Operations subtask, where you can view additional detail about this subcontract operation.  This pushbutton is disabled if the line is a labor operation.

Leadtime/Capacity

Select this pushbutton to open the Leadtime/Capacity subtask, where you can view lead-time and capacity information about this operation.

Text

Select this pushbutton to open the Standard Text subtask, where you can view text attached to this operation.

Work Center

Select this pushbutton open the Work Centers subtask, where you can view additional detail on this operation's work center

Costs

Select this pushbutton to open the Costs subtask, where you can view cost information about this operation.

Labor

Select this pushbutton to open the Labor Classification subtask, where you can view labor classifications used in this operation.

Equipment

Select this pushbutton to open the Equipment subtask, where you can view equipment used in this operation.

Routing Doc

Select this pushbutton to open the Documents subtask, where you can view documents linked to the selected routing line.