Use this screen to impose a ceiling rate for project/account/pool combinations, which are used in the revenue and billing computations. This ceiling rate becomes the "not-to-exceed" rate for the project. Additionally, you can specify an override rate or a fixed rate to be used for reporting purposes only.
Initialize this screen before computing burden cost and before calculating billing or revenue. You should have already set up the following screens: Project Account Groups (Projects » Project Setup » Controls), Basic Info screen (Projects » Project Setup » Project Master), Cost Pool Setup menu in Cost and Revenue Processing, Basic Revenue Info screen (Projects » Project Setup » Revenue Setup), and Project Billing Info screen (Projects » Billing » Billing Master or Projects » Project Setup » Revenue Setup).
Additional maintenance of this screen is required only when you begin a new fiscal year, when a ceiling changes, or when a new ceiling must be added.
Enter, or use to select, a valid project for which you want to enter burden cost ceilings or overrides. This is a required field.
If you do not set a project to Active in the Basic Info screen (Projects » Project Setup » Project Master), or if a project does not allow charging, you can still enter it in this field.
However, inactive projects or those projects that do not allow charging will not be available in .
If you have not set up revenue information for a project, you can still enter the project in this field. However, the system will display the following warning: "Project information has not been set up in the Basic Revenue Info screen."
The field to the right of the project displays the project description from the Basic Info screen.
Enter, or use the drop-down list to select, the fiscal year to which the ceiling or override rate is applicable.
You can select a fiscal year only if you have defined it with a status of O (Open) in the Fiscal Years screen (Accounting » General Ledger » Controls). This is a required field.
Enter, or use to select, an account number for which you want to enter a ceiling or override. This column can display any of the account numbers at any level (including summary levels) contained in the Account Group for the project, exclusive of the accounts that have a function code of Revenue, Billed, or Unbilled-General.
If you do not select an account as part of the pool base in the Cost Pools screen (Projects » Cost and Revenue Processing » Cost Pool Setup), the system will display the following warning: "This account is not in the base of the pool specified."
Burden cost ceilings can be imposed on an account at any level, including the summary level.
This non-editable field displays the name of the account selected. Account names are defined in the Maintain Accounts screen (Accounting » General Ledger » Accounts).
Enter, or use to select, the pool number to which the ceiling or override rate is applicable. All pool numbers entered must have already been set up in the Cost Pools screen (Projects » Cost and Revenue Processing » Cost Pool Setup) for the appropriate fiscal year, with the allocation group number equal to one.
If you have not set up the allocation group number and fiscal year/pool number, the system will display the following warning: "The combination of Allocation Group No., Fiscal Year, and Pool Number must exist in the Cost Pools screen."
This is a required field.
This non-editable field displays the name of the pool selected. You can define pool names in the Cost Pools screen (Projects » Cost and Revenue Processing » Cost Pool Setup).
Enter the ceiling or override value. Ceilings can be positive or zero. If the cost pool is hours-based, the rate displays as a currency amount followed by Amt/Hr in the Rate Format field. If the cost pool is cost-based, the rate displays as a whole number followed by % in the Rate Format field.
This field displays the type of number in the Rate Ceiling field. If the pool is hours-based, this field displays Amt/Hr, and if the pool is cost-based, it displays %.
Enter a COM ceiling or override value. You can enter COM ceilings only if you selected the Apply Cost of Money Rates check box in the Maintain Project Master screen (Projects » Project Setup » Project Master) or the Basic Info screen (Projects » Project Setup » Project Master). If the cost pool is hours-based, the rate displays as a currency amount followed by Amt/Hr in the Rate Format field. If the cost pool is cost-based, the rate displays as a whole number followed by % in the Rate Format field.
This field displays the type of number in the Rate Ceiling field. If the pool is hours-based, this field displays Amt/Hr, and if the pool is cost-based, it displays %.
Enter a code to specify whether the rate entered is a ceiling, an override, or a fixed rate. Available codes are C (Ceiling), O (Override), or F (Fixed Rate).
A C (Ceiling) code acts as a "not-to-exceed" rate. In revenue computations, it prevents revenue from being recognized on the burden above a specified rate. The indirect cost amount is not affected by the ceiling rate. In reports such as the Project Status Report, the actual or target burden still appears as though there was no ceiling. However, the revenue amount will have been reduced by the revenue lost from the burden over the ceiling. In billing computations, if the ceiling rate is lower than the provisional rate, the ceiling rate is used for burdening. Otherwise, the provisional rate is used.
An O (Override) is an alternate rate used in recalculating target and provisional burden only. In revenue computations, an override rate is ignored for calculations involving actual rates. For revenue computations involving target rates, the incurred burden cost amount is replaced by the override rate amount. This burden amount can be seen on reports such as the Project Status Report. This burden override amount would then be used in the revenue calculation. For billing computations, the burden override amount will replace the provisional rate amount on the bills.
An F (Fixed) rate is similar to an override rate in that a specified rate will be used on revenue and billing computations. The difference between the two is that fixed rates do not change the burden amounts for cost computations like the override rates. You can use a specified burden rate for revenue computations without changing your costs. Fixed rates work the same way as override rates for billing computations. The Fixed rate is applied only when you are using target or provisional rates. This type of ceiling is often used when the rate for revenue and billing is lower than the target or provisional rate.
Enter the code that determines whether the ceiling percent applies to the Revenue, Billing, or Both computations. Available codes include the following: R (Revenue), B (Billings), "A" (Both Revenue and Billings), or N (Neither Revenue nor Billings).
Any rows that display an Apply to RBA code will be saved. Rows that have a "0.00" Ceiling Percent entered and no Apply to RBA code will not be saved. To place a ceiling on a particular account, you must enter both the Rate Ceiling (and/ or COM Ceiling) and the Apply to RBA code.
Changes to this screen update the CEIL_BURDEN_CST table.