This subtask is only available if you have a license for the Master Production Scheduling module. The fields display data as set up in the Master Production Scheduling (Materials » Master Production Scheduling) module.
This field displays the part number for the part selected on the main screen. The description of the part displays in the field below this one.
This field displays the revision number for the selected part.
The inventory, or default unit of measure for the selected part displays in this field.
This field displays M (Make) or B (Buy), depending on whether the part is typically manufactured or purchased.
This field displays the total lead time, in days, for the part as specified in the Planning Part Data (Materials » Product Definition » Part Master) screen.
This field displays the planning type for this part:
(None) - The part requires no planning type consideration.
MRP - The part will be used by the Materials Requirement Planning process.
Reorder - The part will not be used by MRP or MPS, but still requires planning.
MPS - The part will be used by the Master Production Scheduling process.
The MPS time fence is intended to limit changes to the master production schedule within a specified amount of time in the future.
This value in this field is used as the MPS time fence only if the MPS Time Fence Method field on the MPS Settings (Materials » Master Production Scheduling » MPS Controls) screen is set to Use Part Time Fence.
Enter a value in this field to limit changes to the sales order within a specified amount of time in the future.
Enter a value in this field to define the total lead time, including component and subassembly lead times, required to complete this part.
This value in this field is used as the MPS time fence only if the MPS Time Fence Method field on the MPS Settings (Materials » Master Production Scheduling » MPS Controls) screen is set to Use Part Cumulative Lead Time.