MO OPERATION COMPLETIONS

Use this non-editable subtask to view MO operation completion lines.  If the SFC Operation field is "Y" (Yes) for an operation line in the Routings subtask in Enter Manufacturing Orders, and SFC data has been entered in the Enter MO Operation Completions screen (under the Shop Floor Control menu), this table window will display that information. When the MO operation completion information is loaded, you can view the quantity completed, who completed it, and when the transaction took place.

MO

This field displays the MO from the selected line in the table window.

Planner

This field displays the planner responsible for the MO.

Status

This column displays the current status of the MO. Options are: "Closed," "Completed," "Firm Planned," "In Shop," "Planned," and "Released."  You cannot change the status of the MO to "Planned" or "Firm Planned" if there have been material issues or units completed or timesheet activity against the MO.

Build Part

This field displays the part ID for which the MO was created. A description of the part displays below this field.

Rev

This field displays the revision level of the part.

Operation

This field displays the labor or subcontractor operation code being performed in this routing step.  The operation description displays to the right of this field.

Operation No

This field displays the operation sequence number of this routing step.

Alt Oper No

This field will display an alternate operation sequence if the Include Alternate Operations checkbox is selected when the entry was made in the Routings subtask in Enter Manufacturing Orders. Any routing operation with an alternate operation number greater than zero is considered an alternate operation.

Step

This field displays the step number of the routing operation.

Table Window

Transaction Date

This column displays the default transaction date for new MO routing completion rows.

Operator

This column displays the default operator employee ID.

Completed Quantity

This column displays the current completed quantity of the part built with this MO.

Entry Date/Time

This column displays the date and time when the inspection was recorded.

Entry User

This column displays the user ID of the person who recorded the inspection.