Use this subtask to allocate the MO build quantities to multiple inventory abbreviations. Allocations are used to identify where the finished parts on the MO are to be distributed. At least one allocation line (Build-To Inv Abbrev) per MO is required. Allocations are determined by allocated quantity, and the sum of allocated quantities must equal the build quantity of the MO. If you selected the Allow Multiple Inv Abbrev Build-To Allocations for MOs checkbox in the Production Control Settings screen, you can select the New Line button on the toolbar to add a new build-to inventory abbreviation. Inventory Abbreviations can be assigned across multiple inventory projects only if you selected the Allowed with Other Projects radio button for the Inventory Project in the MO Allocations Across Projects group box in the Inventory Projects screen. If you attempt to add a new line and the Allowed with Other Projects radio button is not selected and the Build-To Inv Abbrev contains a different inventory project than the previous line, the system will display an error message indicating that the project for this inventory abbreviation does not allow commingling with another project on an MO.
This field displays the MO ID.
This field displays the type of the MO.
This field displays the current status of the MO.
This field displays the part ID for which the MO was created. A description of the part displays in the unlabeled field below this field.
This field displays the revision level of the part.
This field displays the part's unit of measure.
This field displays the warehouse in which the MO is being built.
This field displays the quantity of the part being built with this MO.
This field displays the quantity of completed parts being built with this MO.
This field displays the build-to inventory abbreviation(s) to which the MO parts will be allocated on completion. You can edit this field. You cannot change this inventory abbreviation once charges have been applied to the MO, or units have been completed against it. If you selected the Allow Multiple Inv Abbrev Build-To Allocations for MOs checkbox in the Production Control Settings screen in Costpoint Production Control, you can use the New Line button on the toolbar to add a new build-to inventory abbreviation. All such allocation projects must meet the inter-project issue restrictions for the subassembly and raw material inventory projects (as set up in the Inventory Projects screen in Costpoint Inventory). If the MO Type is "Customer Repair," the inventory abbreviation entered must have an account type of "G" (Government Furnished).
This field displays the inventory abbreviation name.
This field displays the quantity of parts to be allocated to this inventory abbreviation. The sum of the allocated quantities must match the MO build quantity.
This field displays the quantity of completed parts allocated to this inventory abbreviation.
This field displays the yield quantity allocated to this inventory abbreviation. If you selected the Include Scrap/Yield % in Planning Process checkbox in the Production Control Settings screen, the system calculates this field as (Allocated Quantity - Completed Quantity)* Yield. If the part is an MBOM assembly, you enter its yield percentage in the Assembly Information subtask of the Maintain MBOM and/or Release MBOM screens in Costpoint Bills of Material. If you did not select the Include Scrap/Yield % in Planning Process checkbox, the Yield Quantity is the difference between Allocated Quantity and Completed Quantity.
This field displays the project ID associated with the inventory abbreviation selected.
This field displays the project abbreviation ID of the project.
This field displays the project name.
This field displays the netting group ID assigned to the project.
This field displays the cost method used for the project.
This field displays the account type associated with the selected inventory abbreviation.