Use this subtask to view details of manufacturing orders for the selected row in the main screen.
Use this subtask whenever you need further details about the manufacturing order referenced in the action message on the main screen. You can maintain information in this screen if you selected the Allow MO Maintenance checkbox in the MRP Settings screen.
This field displays the action message suggested for the requisition, either "Cancel Order," "Reschedule Order," or "Decrease Qty."
This field displays the part ID as shown in the main screen. The description for the part is displayed in the unlabeled field below this field.
This field displays the revision of the part shown in the main screen.
This field displays the unit of measure of the selected part.
This field displays the manufacturing order ID.
This field displays the type of the manufacturing order.
This field displays the current status of the manufacturing order. Options are "Closed," "Firm," "Planned," "In Shop," and "Released." You can maintain this status only if you selected the Allow MO Maintenance checkbox in the MRP Settings screen.
This field displays the planner responsible for this MO.
This field displays the warehouse in which the MO is being built.
This field displays the supervisor associated with the MO.
This field displays the inventory abbreviation code to which the MO build parts are being allocated. The name of the inventory abbreviation is displayed in the adjacent unlabeled field.
This field displays the project ID associated with the inventory abbreviation to which the MO build parts are allocated.
The field displays the MO quantity that will be built and allocated to the associated inventory abbreviation. You can maintain this field only if you selected the Allow MO Maintenance checkbox in the MRP Settings screen.
This field displays the quantity yet to be completed for the given inventory abbreviation allocation.
This field displays the quantity yet to be completed against the MO for the given inventory abbreviation allocation. It includes scrap/yield losses. This field is displayed only if you selected the Incl Scrap/Yield % in Planning Process checkbox in the Production Control Settings screen in Costpoint Production Control.
This field displays the quantity that has been built and relieved against the MO for the given inventory abbreviation allocation.
This field displays the open quantity suggested by MRP.
This field displays the date on which the MO is due to be completed. You can maintain this field only if you selected the Allow PO Maintenance checkbox in the MRP Settings screen. Modification of this date also updates the Plnd Avail date.
This field displays the date on which the MO is planned for release to the shop floor. This field is not displayed if the MO Status is "In Shop."
This field displays the date on which the date is planned for release to the stockroom. This field is not displayed if the MO Status is "Released" or "In Shop."
This field displays the date on which the parts built with the MO will be available. The system calculates this value by adding the part's manufacturing stocking lead time to the Due date.
This field displays the date on which the MO must be completed.
This field displays the due date suggested by the MRP system. The system calculates this value by subtracting the manufacturing stocking lead time from the need date.
This field displays the date suggested by the system for releasing the manufacturing order to the shop floor. The system calculates this value by subtracting the manufacturing, manufacturing inspection, and manufacturing stocking lead times from the need date of the requirement.
This field displays the release date suggested by the system. The system calculates this value by subtracting the manufacturing picking, manufacturing, manufacturing inspection, and manufacturing stocking lead times from the need date of the requirement.