ECN Parts Subtask

Use this subtask to view all engineering change notices (regardless of status) referencing the part entered in the main screen header.

Part

This field displays the part ID for the part selected on the main screen. The part description displays in the unlabeled field to the far right.

Rev

This field displays the selected part's revision number.

Table Window

ECN

This field displays the ID of the Engineering Change Notice linked to the selected part.

Rev

This field displays the revision number for the ECN (i.e., how many times it has been resubmitted for approval).

Description

This field displays a short description of the ECN.

Status

This field displays the status of the ECN, which can be:

Type

This field displays the ECN type assigned to the ECN. ECN types are defined in the EC Types screen in the Engineering Change Notices module.

Class

This field displays the class assigned to the ECN. Three options are valid:

Priority

This field displays the priority or importance of the ECN. Priority codes are assigned in the EC Priority screen.

Reason

This field displays the code classifying the reason for the ECN. Reason codes are defined in the EC Reason screen.

Action Code

This field displays the code for the action that the ECN will perform on the part:  

Original Part

This field displays the identifier of the original part that will be affected by the ECN. This field will be empty for records with an action code of "Add."  For lines with an action code of "Replace," the original part represents the part that will be replaced.

Orig Rev

This field displays the revision number of the part that will be affected by the ECN. For lines with action code of "New Rev," it represents the revision before it is updated.

Orig Part Description

This field displays the description of the original part that will be affected by the ECN.

Orig Status

This field displays the release status of the original part that will be affected by the ECN: "E" (Estimating), "O" (Obsolete), "P" (Pre-Release), "R" (Released), "S" (Phase-Out), or "U" (Unreleased).

Orig Part Active

This field displays "Y" (Yes) or "N" (No) depending whether or not the Original Part affected by the ECN was active.

Change-To Part

This field displays the ID of the part that will replace the original part. This field will be blank for lines with an action code of "Change," "Delete," and "Obsolete."

Change-To Rev

This field displays the revision of the part that will replace the original part. For lines with action code of "New Rev," it represents the revision after it is updated by the ECN.

Change-To Part Description

This field displays the description of the change-to part. For lines with action code of "Add," this field displays the description of the new part being created by the ECN.

Change-To Status

This field displays the release status that the change-to part will be assigned by the ECN:  "E" (Estimating), "O" (Obsolete), "P" (Pre-Release), "R" (Released), "S" (Phase-Out), or "U" (Unreleased).

Change-To Cage

This field displays the CAGE code of the change-to part to be added by the ECN.

Change-To Make/Buy

This field displays "B" (Buy) if the change-to part is normally purchased and "M" (Make) if it is normally manufactured.

Effective Date

This field displays the date on which the changes were/are to become effective.

Material Disposition

This field displays the code for how existing inventory for the original part will be dispositioned: "S" (Scrap), "R" (Rework), "I" (Reinspect), "N" (No Change), or "V" (Update Rev).

Originator

This field displays the employee ID of the person originating the ECN.

Originator Name

This field displays the name of the person originating the ECN.

Organization

This field displays the organization to which the ECN is linked.

ECN Date

This field displays the date on which the ECN originated.

Submit for Approval Date

This field displays the date on which the ECN was submitted for approval.

Approval Date

This field displays the date on which the ECN was approved.

Planned Impl Date

This field displays the date on which Costpoint part, BOM and routing changes are planned for implementation.

Implementation Date

This field displays the date on which the Costpoint part, BOM and routing changes were implemented.

Cust Apprvl Reqd

This field displays "Y" (Yes) or "N" (No) depending on whether or not customer approval is required for the ECN.

Customer

This field displays the ID of the customer for whom the ECN is being prepared.

Customer Name

This field displays the name of the customer for whom the ECN is being prepared.

Cust Apprvl Status

This field displays the current status of the customer approval. Options are "Not Required," "Pending," "Approved," or "Rejected."

ECP

This field displays the Engineering Change Proposal (ECP) number assigned to the ECN.

ECP Type

This field displays the current type of the ECP: "Formal," "Preliminary," or "Not Applicable."

CAGE

This field displays the CAGE ID of the entity assigned responsibility to the ECN.

Approval Project

This field displays the ID of the project that is to be used to determine which users can approve the ECN.

Hold

This field displays "Y" (Yes) or "N" (No) depending on whether or not the ECN is on hold.

Originator Phone

This field displays the phone number of the originator of the ECN.

Originator Phone Ext

This field displays the phone extension of the originator of the ECN.

Approval Process

This field displays the approval process this ECN will be/was required to pass through before implementation.

Last Change User

This field displays the user ID of the person who made the last change to the ECN.

Last Change Date/Time

This field displays the date and time of the last change to the ECN.

Entry User

This field displays the user ID of the person who originally created the ECN.

Entry Date/Time

This field displays the date and time on which the ECN was originally created.

Tables

The Costpoint tables impacted are listed in the following table:

Screens

Tables

ECN Parts

ECN

ECN_PART