Use this subtask to enter manufacturing order timesheet data for this timesheet line. This subtask appears automatically after you enter an "M" in the Type column of the Enter Timesheets screen and tab out. You can enter manufacturing orders in Costpoint Production Control.
Use this subtask to enter data about the manufacturing order to which this timesheet is being charged.
Enter, or use Lookup to select, a manufacturing order number to which this timesheet is charged. This is a required field.
This non-editable field displays the status of the manufacturing order.
This non-editable field displays the project to which this manufacturing order has been assigned.
Enter, or use Lookup to select, the operation sequence number of the routing operation for this manufacturing order.
Enter, or use Lookup to select, the step number of the routing operation that is associated with this manufacturing order.
The descriptions for both the Operation Sequence number and the Step number are displayed in the untitled display-only field below those two fields, if that information is available.
Use the drop-down box to select "Run" to record hours against a manufacturing order or "Set Up" to record setup hours.
Enter, or use Lookup to select, a work center ID to which this timesheet is charged. The name or description of the work center is displayed in the field to the right.
Select this pushbutton to save the data and return to the Enter Timesheets screen.
Select this pushbutton return to the Enter Timesheets screen without saving data.