MANUFACTURING ORDER TIMESHEET INFORMATION

Use this subtask to enter manufacturing order timesheet data. This subtask appears automatically after you enter an "M" in the Type column of the Enter Correcting Timesheets screen. To change data, select the MO pushbutton to open this subtask. You can enter manufacturing orders in Costpoint Production Control.

Use this subtask to enter data about the manufacturing order to which this timesheet is being charged.

Manufacturing Order

Enter, or use the Lookup pushbutton to select, a manufacturing order number to which this timesheet is charged. This is a required field.

Status

This non-editable field displays the status of the manufacturing order.

Project

This non-editable field displays the project to which this manufacturing order has been assigned.

Operation Sequence

Enter, or use the Lookup pushbutton to select, the operation sequence number of the routing operation for this manufacturing order.

Step

Enter, or use the Lookup pushbutton to select, the step number of the routing operation that is associated with this manufacturing order. The descriptions for both the operation sequence number and the step number are displayed in the box below these two fields, if that data is available.

Activity Type

Using the drop-down box, select "Run" to record hours against a manufacturing order or "Set Up" to record setup hours.

Work Center

Enter, or use the Lookup pushbutton to select, a work center ID to which this timesheet is charged. The name or description of the work center is displayed in the unlabeled field to the right.