MBOM CHANGE-TO PART ASSEMBLIES

This subtask is enabled if the Action Code is "A - Add," "R - Replace" or "V - New Rev" and the Change-To Part is populated for the selected line in the main screen. Use this subtask to view and update the MBOM assemblies that use the Original Part. If there are MBOMs that use this component in Costpoint Bills of Material, this subtask will load the existing assembly parts without the Action Code

ECN

This field displays the ECN ID from the main screen. The ECN description displays in the unlabeled field to the right.

Component

Part

This field displays the change-to part ID from the main screen. The part description (from the Basic Part Data screen in Costpoint Product Definition) displays in the unlabeled field beneath this field.

Rev

This field displays the change-to part revision from the main screen.

Part Status

This field displays the change-to part status from the main screen.

Inv U/M

This field displays the default inventory unit of measure code for the change-to part from the main screen

Table Window

If the Action Code for the selected line in the main screen is "A - Add" or "R - Replace," and the Original Part is a component in an MBOM assembly, the change-to part will display in the Component Part field, but those assemblies in which the original part is a component will display in the table window without an Action Code. If the Replace in All BOMs column is "Y" for the selected line in the main screen and you open this subtask, the system will display the following message:

"Warning: Changes made in this screen may overwrite changes created by the Replace in BOM function."

This warning means that if you make changes in this subtask, only those changes will be saved for the affected assembly, even if the Replace in All BOMs column is "Y" (Yes) for the selected line in the main screen. However, if you do not add a line or make changes to an existing line in this subtask, the Change-To Part will replace the Original Part in all MBOMs where the Original Part exists as a component. In this case, all MBOM assemblies and configurations from the original part/revision in the main screen will be copied based on the starting and ending effective dates once you run the Implement ECN Changes screen.

Action Code

Select from the drop-down box the action this ECN will perform.  You can select either "A - Add," "C - Change," or "D - Delete" in this optional field. The default is "A - Add" for newly added lines or lines that are copied from another assembly.

Line

Enter up to four digits of the line number to identify the specific MBOM component line in this required field.

Find

Enter up to four alphanumeric characters for the drawing find number of this MBOM component line in this required field. Upon populating the Line field for a new line, this field will default with zeroes, but can be changed. For example, if you enter "3" in the Line field, the Find field will default to "0003."

Assembly Part

Enter, or use Lookup to select, the assembly part ID that uses the component part displayed in the header. This required field of up to 30 alphanumeric characters must be a valid part ID from the Basic Part Data screen in Costpoint Product Definition. If the Original Part for the selected line in the main screen is a component in an MBOM assembly, this field displays the assembly part. New assembly parts can be added.

Assy Rev

Enter, or use Lookup to select, the assembly part revision that uses this component. This optional field of up to three alphanumeric characters must be a valid revision code from the Basic Part Data screen in Costpoint Product Definition.

Assembly Description

This field displays the assembly part description.

Comp Type

Enter the component type code in this required field: "B" (Buy With Component), "S" (Standard), "P" (Phantom), "R" (Reference), "T" (Tool), or "D" (Deleted). The default is the component part type from the Basic Part Data screen in Costpoint Product Definition.

Qty Type

Enter the quantity type code in this required field: "A" (Per Assembly), "R" (As Required), or "O" (Per Order). This Qty Type field is for the component part. If you have selected the As Required checkbox in the Basic Part Data screen in Costpoint Product Definition for the component part, or the Comp Type is "R" (Reference), the default for this field is "R." If the Comp Type is "T" (Tool), the default for this field is "O." Otherwise, the default is "A."

Quantity

Enter up to 14 digits in this required field, including two digits after the decimal point, for the component part quantity required in the MBOM. The default is "1." If the Qty Type is "R," the default is zero; if a number other than zero is entered, an error message will display.

Make/Buy

Enter "M" (Make) in this required field if the component is to be manufactured or "B" (Buy) if it is to be purchased. The default is the component part's make/buy designation from the Basic Part Data screen in Costpoint Product Definition.

Configuration

Enter, or use Lookup to select, the ID of the configuration in which this component will be used when planning this MBOM.  This is an optional field. If entered, this must be a valid BOM configuration ID from the Configuration Identifiers screen in Costpoint Bills of Material. This field will be hidden if you did not select the Use Configuration IDs checkbox in the BOM Corporate Settings subtask of the BOM Settings screen in Costpoint Bills of Material.

Configuration Description

This field displays the configuration description from the Configuration Identifiers screen in Costpoint Bills of Material. This field will be hidden if you did not select the Use Configuration IDs checkbox in the BOM Corporate Settings subtask of the BOM Settings screen in Costpoint Bills of Material.

Effective Starting Date

Enter the date on which this component will become effective in this MBOM. This field is required and can be changed. This field defaults with the Suggested Effective Date in the ECN Detail subtask, or the Effective Date (from the selected line in the main screen) if the Suggested Effective Date is null. This field defaults with the current system date if both the Suggested Effective Date and Effective Date are null.

Effective Ending Date

Enter the date on which this component will cease being effective in this MBOM.  This field is optional, and defaults with the MBOM component's Effective Ending Date (if the date exists). If this date is earlier than the current date but later than the effective starting date, the system will display a warning message when you tab out of this field.

If this date is earlier than the Effective Starting Date, an error message will display.

Component Released

Enter "Y" (Yes) in this required field to release this component in this MBOM, or  "N" (No) to keep it unreleased. This is a required field. The default value is determined by the radio button selected in the MBOM Release Control - Default Component Release Status in Bill group box in the BOM Settings screen in Costpoint Bills of Material.

Reference Designators

If you did not select the Use Extended Length Reference Designators checkbox in the BOM Corporate Settings subtask of the BOM Settings screen, enter up to 254 alphanumeric characters of reference designator text for this component on this assembly in this optional field. However, if you selected the Use Extended Length Reference Designators checkbox, you can enter up to 32,000 alphanumeric characters in this field. This field displays any reference designator text that was assigned to the component part line in the Component Reference Designators subtask of the Maintain MBOM and/or Release MBOM screens.

Component Comments

Enter up to 254 alphanumeric characters of any comments that apply to this MBOM component in this optional field. This field will display any comments already entered for the MBOM component.

Assembly BOM Release Status

This field displays the assembly part release code (i.e., "R" for Released, "P" for Partially Released, or "U" for Unreleased) from the BOM Status field in the Maintain MBOM or Release MBOM screens in Costpoint Bills of Material.

Assembly Part Status

This field displays the assembly Part Status Type from the Basic Part Data screen in Costpoint Product Definition. You can also change the part status for the MBOM in the Maintain MBOM or Release MBOM screens.

Omit Requirements

Enter "Y" (Yes) in this required field to exclude material planning processes from planning material requirements. If the component is a buy part, and the Comp Type is not "B" (Buy With Component), the default is "Y" (Yes). If the Comp Type is "R" (Reference) or "T" (Tool), the default is also "Y" (Yes). Otherwise, the default is "N" (No).

Stop Explosion

Enter "Y" (Yes) in this required field to prevent material planning processes from planning any components of this subassembly part. If the Comp Type is "R" (Reference) or "T" (Tool), the default is "Y" (Yes). Otherwise, the default is "N" (No).

Scrap

Enter the anticipated scrap percentage used when planning material requirements. This field is required.  The default is the component part scrap percentage from the Planning Part Data screen in Costpoint Product Definition.

Copy Data

Enter "Y" (Yes) in this required field to copy all other original MBOM data to a new line. The default is "N" (No). Only the lines that have been loaded from a copied MBOM can be set to "Y" (Yes).

Copy Assemblies

Select this pushbutton to open a subtask where you can copy an assembly from another part/revision. This pushbutton is disabled if assembly information exists in the table window and/or the Assembly Part field is populated.