Use this subtask to view projects linked to the selected end part configuration. If no end part configuration exists, this subtask will be disabled.
This field displays the part number of the assembly linked to the selected end-part configuration. The description of this part displays in the untitled field adjacent to the Rev field.
This field displays the revision level of the assembly part number.
This field displays the ID of the MBOM configuration. The descriptions displays in the untitled field to the right.
This field displays the effectivity date of the configuration.
This field displays the starting serial number for which this configuration will be effective.
This field displays the ending serial number for which this configuration will be effective.
This field displays the project ID linked to the selected configuration.
This field displays the project abbreviation for the project ID.
This field displays the project name.
This field displays "Y" (Yes) if the project is active, "N" (No) if it is inactive.
This field displays the starting date of the period of performance for the project to be linked to this configuration.
This field displays the ending date of the period of performance for the project to be linked to this configuration.
For manufacturing BOMs, the information that displays in this screen is stored in the following tables: MFG_BOM, BOM_CONFIG, BOM_CONFIG_PROJ, CONFIG_PROJ, END_PART_CONFIG, and PROJ.
For engineering BOMs, the information that displays in this screen is stored in the following tables: ENG_BOM, BOM_CONFIG, BOM_CONFIG_PROJ, and PROJ.