LINK PROJECTS

Use this subtask to link specific projects to individual part/revision/ configuration combinations.

Part

This field displays the part number of the end item to which projects are linked. A description of the part displays in the untitled field adjacent to the Rev field.

Rev

This field displays the part revision of the end item to which projects are linked.

Configuration

This field displays the ID of the MBOM configuration, followed by its description.

BOM As of Date

This field displays the effectivity date of the configuration.

Starting Serial No

This field displays the starting serial number for which this configuration will be effective.

Ending Serial No

This field displays the ending serial number for which this configuration will be effective.

Table Window

Project

Enter, or use Lookup to select, the ID of a valid project to link to this configuration. This required field loads automatically, if you enter data in the Proj Abbrev field.

Proj Abbrev

Enter, or use Lookup to select, a valid abbreviation of the project to link to this configuration. This required field loads automatically if you enter data in the Project field.

Project Name

This field displays the description of the project to be linked to this part/configuration.

Active

This field indicates whether the project to be linked to this part/configuration is active ("Y") or inactive ("N").

Starting Date

This field displays the starting date of the period of performance for the project to be linked to this part/configuration.

Ending Date

This field displays the ending date of the period of performance for the project to be linked to this part/configuration.

Table Information

The information in this screen is stored in the END_PART_CONFIG table. Information is also stored in and/or pulled from the ITEM, PART, S_STATUS_TYPE, and BOM_CONFIG tables.