Use this subtask to link specific projects to individual part/revision/ configuration combinations.
This field displays the part number of the end item to which projects are linked. A description of the part displays in the untitled field adjacent to the Rev field.
This field displays the part revision of the end item to which projects are linked.
This field displays the ID of the MBOM configuration, followed by its description.
This field displays the effectivity date of the configuration.
This field displays the starting serial number for which this configuration will be effective.
This field displays the ending serial number for which this configuration will be effective.
Enter, or use Lookup to select, the ID of a valid project to link to this configuration. This required field loads automatically, if you enter data in the Proj Abbrev field.
Enter, or use Lookup to select, a valid abbreviation of the project to link to this configuration. This required field loads automatically if you enter data in the Project field.
This field displays the description of the project to be linked to this part/configuration.
This field indicates whether the project to be linked to this part/configuration is active ("Y") or inactive ("N").
This field displays the starting date of the period of performance for the project to be linked to this part/configuration.
This field displays the ending date of the period of performance for the project to be linked to this part/configuration.
The information in this screen is stored in the END_PART_CONFIG table. Information is also stored in and/or pulled from the ITEM, PART, S_STATUS_TYPE, and BOM_CONFIG tables.