Use this subtask to map Project Labor Categories (PLCs) to each line.
This subtask is available only if the billing formula linked to the project is an LLR formula. This enables you to match specific labor resources to a CLIN. The following are considered LLR formulas:
Billing Formula |
Billing Formula Description |
CIMR |
Labor Cost Times Multiplier Plus Non-Labor Times Multiplier (Hours) |
LLR |
Loaded Labor Rate |
LLRCINBF |
Loaded Labor Plus Non-Labor W/Burden W/Fee |
LLRCINL |
Loaded Labor Plus Cost Incurred on Non-Labor |
LLRCINLB |
Loaded Labor Plus Non-Labor Plus Burden on Non-Labor |
LLRFNLBF |
LLR W/Fee Plus Non-Labor W/Burden W/Fee |
RSBFNLBF |
Loaded Labor Rate W/Burden W/Fee Plus Non-Labor w/Burden W/Fee |
RSMNLM |
Rate Schedule Times Multiplier Plus Non-Labor Cost Times Multiplier |
Example:
The charges are as follows:
Project |
Account |
PLC |
Amount |
C001.01.01 |
ENG-01 |
E01 |
50,000 |
C001.01.01 |
ENG-35 |
E35 |
15,000 |
C001.01.01 |
SUP-10 |
S10 |
10,000 |
C001.01.02 |
SUP-10 |
S10 |
25,000 |
C001.01.03 |
DIR-15 |
D15 |
60,000 |
The account mapping looks like this:
Project |
CLIN |
Starting Account |
Ending Account |
C001.01.01 |
0001AA |
ENG |
ENZ |
C001.01.01 |
0002AB |
SUP |
SUZ |
Because you have already mapped accounts to C001.01.01/0002AB, no PLCs can be mapped to this project. You must delete the accounts mapping for project C001.01.01 and then create this mapping:
Project |
CLIN |
PLC |
C001.01.01 |
0001AA |
E01 |
C001.01.01 |
0001AA |
E35 |
C001.01.01 |
0002AB |
S10 |
This field displays the project from the main screen. The project description displays in the field to the right.
This field displays the CLIN from the CLIN Mapping subtask.
Enter, or use to select, a PLC.
This field displays the description of the PLC you selected, but you can edit it.
Changes to this subtask update the PROJ_WAWF_PLC table.