Use this subtask to determine what will be printed in the heading of the bill.
This field displays the selected billing format code from the main screen. The billing format description displays in the untitled field to the right.
In this group box, select which set of contract values, if any, you want to print on the billing header. You can elect to Show Contract Value, Show Funded Value, Show Both, or Show Neither. The following is an example of how values are presented if you click the Show Both option. These values will appear on the right-hand side in the invoice header:
|
Contract Value |
Funded Value |
Cost |
$3,240,740.74 |
$2,314,814.81 |
Fee |
$ 259,259.26 |
$ 185,185.19 |
Total |
$3,500,000.00 |
$2,500,000.00 |
Select this option to print only the contract value information on the billing header.
Select this option to print only the funded value information on the billing header.
Select this option to print both contract value and funded value information on the billing header.
Select this option if you do not want to print either the contract value or the funded value information on the billing header.
Select this check box to show the percentage of the value billed to date. This percentage will be calculated in accordance with your selection in the Contract Value group box. If you selected Show Contract Value, the percentage will be based on the contract value. If you selected Show Funded Value, the percentage will be based on the funded value. If you selected Show Both, two percentages will be displayed, one based on contract value, the other based on funded value. If you selected Show Neither, no percentage will be displayed.
Select this check box to display the total of amounts billed to date, including this billing. This check box controls both the printing of the Cumulative column on the bill and the Cumulative Billed to Date line in the header.
Select this check box to print a tax line for each tax code used when the invoice was calculated. If you do not select this check box, all tax codes used in the calculation of the invoice will be combined and printed on one line. You will typically select this check box if your invoice contains sales or VAT tax from multiple taxing authorities.
Select this check box to print the latest period of performance from the Modifications table.
Select this check box to print the remittance address on the billing header.
Select this check box to print the customer's name and billing address on the heading of the bill.
Select this check box to print the project number and title on the heading of the bill.
Select this check box to print the Prime Contract No from the Basic Info screen (Projects » Project Setup » Project Master) on the heading of the bill.
Select this check box to print the Subcontractor No from the Basic Info screen (Projects » Project Setup » Project Master) on the heading of the bill.
Select this check box to print the program manager's name on the billing header.