SET UP PROJECTS TAB

This is the first step in the Costpoint to P3 interface. Use this tab to set up mappings between Costpoint Project IDs and P3 Project Group and/or Project IDs and Activity IDs. Also indicate the burden type to be transferred for each mapped P3 Project ID. 

After logging into Costpoint, you must also log into P3 through the interface before using the Set Up Projects tab. You can update this tab at any time; however, you will normally populate it when initializing the interface and before populating the Set Up Resources tab and moving data into P3. Once you have defined Project Mappings, you will not need to modify them unless there are changes to the project structure (i.e., when new tasks are added).

Note: Before filling out the Mapping tab, you must create Projects in Costpoint and create and assign Activities in P3. 

Range

Use the drop-down box to select the Costpoint project IDs to be mapped to P3 Project and Activity IDs. Valid options are "All," "One," "Range," "From Beginning," and "To End." The default for this field is "All." 

Note: We do not recommend choosing "All" unless the expected number of Project IDs is small or the majority of projects are maintained in P3.

From

Enter, or use Lookup to select, the starting Costpoint Project ID to be added to the mapping table. If you select "All" or "From Beginning" in the Range field, this field will be inactive.  Manually entered Project IDs must be a valid entry in Costpoint's Project table.

To

Enter, or use Lookup to select, the ending Costpoint Project ID to be added to the mapping table. If you select "All," "One," or "To End" in the Range field, this field will be inactive. A manually entered Project ID must be a valid entry in Costpoint's Project table.

Fill Table

Select this pushbutton to populate the Costpoint Project column of the mapping grid with all Costpoint Project IDs defined by the selected range.

Note: When you select the Fill Table pushbutton, the mapping grid will also include any records that were previously mapped to the selected range of Costpoint Project IDs. 

Save

Select this pushbutton to save the project setup and mappings that you entered.

Mapping Grid

Costpoint Project

When you select the Fill Table pushbutton, this non-editable column is populated with Costpoint Project IDs in accordance with the selected Range

P3 Project

Enter, or use Lookup to select, a P3 Project Group-Project ID-Activity combination (Project Group is optional). 

P3 Activity

Enter, or use Lookup to select, a P3 Activity ID. You can use only P3 Activity IDs created as part of a Project Group or Project. Use this field to indicate the mapping between a Costpoint Project ID and a P3 Project Group or a Project ID and a P3 Activity ID.

Burden Type

Enter, or use Lookup to select, "T" (Target), "A" (Actual), or "N" (None) for each mapped P3 Project and Activity ID ("T" is the default).  If you chose "A," the interface uses the year-to-date actual indirect rates.

Costpoint Project Name

This non-editable column displays the Costpoint project name associated with the Costpoint Project.

P3 Project Name

This non-editable column displays the P3 Project Title associated with the P3 Project.

P3 Activity Name

This non-editable column displays the P3 Activity Name associated with the P3 Activity.

P3 Activity Prefix

This non-editable column displays the P3 Activity Prefix associated with the P3 Activity.

P3 Project Group

Enter, or use Lookup to select, the P3 Project Group to be added to the mapping table, if applicable.

P3 Project Title

This non-editable column displays the P3 Project Title associated with the P3 Project.

Screen Error Messages:

During the move, data is transferred from Costpoint to P3 for only those Costpoint Project IDs that are mapped in the Set Up Projects tab.

Mappings are saved when you select the Save button or select Save from the toolbar menu.