Criteria Page of the Reclass Wizard
Use this page to select the portion of the project that you want to reclass.
Contents
| Field | Description |
|---|---|
| Criteria | Use this field to select one of the following options:
If you want to reclass the entire project, select Total Project. Note: The options listed in this field are based on the control account, work package, and resource assignment structures that you define on the Fields tab of the Project Properties dialog box.
|
| Selection | This field is enabled if you select a criterion other than Total Project in the Criteria field. Click |
| Include all children | This option is available if you select a code with children in the Selection field. Selecting this option instructs Cobra to run the process against the parent code and its children. For example, if you selected WBS code 1 in the Selection field and this has child codes 1.1 and 1.2, then Cobra will run the process against codes 1, 1.1, and 1.2. This option is enabled only for code criteria that are hierarchical in nature, such as WBS and OBS. |
Parent Topic: Reclass Wizard