Procedures
Follow the procedures in this section to manage the Files tab of the Project Properties dialog box.
- Related Topics:
- Assign Ancillary Files to a Project
Use the Files tab of the Project Properties dialog box to assign ancillary files to a project. - Select the Level at Which to Capture Actual Costs
Use the Files tab of the Project Properties dialog box to change the level at which actual costs are captured. - Run the Rolling Wave Process Without Advancing the Calendar
You can run the Rolling Wave process from the Files tab of the Project Properties dialog box without advancing the calendar.
Parent Topic: Files Tab of the Project Properties Dialog Box