Schedule Mapping Page of the Integration Wizard — Open Plan

Use this page to define how the fields in the schedule map to the Cobra project.

Note: The Schedule Mapping page of the Integration Wizard displays if you are importing project data.

Project Keys Tab

Use this tab to define the project keys to use when mapping to the schedule. If you are creating a new project, the labels and Cobra validation files on this tab are based on the project information for the selected project. Any control account fields that are not defined in the project are hidden.

When creating a new project, the labels and validation files are based on the template project defined on the Application Preferences dialog box of the application. If no template project is defined, the fields are based on the system defaults for new projects.

Field Description
Schedule Fields Use these fields to define the field in the schedule that contains the value for each Cobra field. Click to select a value for each of the fields below:
  • WBS: This field is required.
  • OBS
  • WP_NO.: This field is required.
  • Milestone
  • CAM
  • WP Manager: This field displays only when you select Code Assignments and User Fields on the Action Selection page.
  • Note Categories > Click to select a note category in the selected schedule. You can import notes for all categories by multi-selecting the list. This option is only available when loading data from Open Plan.

Notes are always imported from the current note on the activity, so baseline date selection is not considered. If the Note field does not exist in Cobra, Cobra adds it during the import.

The values in these fields depend on the date field selected for Baseline and Forecast, and the scheduling tool you are importing from.

You cannot import using the CA3 field unless a template project that defines this field is defined or you are importing into an existing project with this field defined.

When importing data from baseline dates in Open Plan, the following values are available in the Control Account 1-3, Work Package, Milestone, and CAM fields.
  • Activity ID
  • Baseline Codes
  • Baseline User Character Fields
When importing early or late dates from Open Plan, the following fields are available in the Control Account 1-3, Work Package, Milestone, and CAM fields.
  • Activity ID
  • Codes
  • User Character Fields

Cobra File Used for Validation

Use the fields in this column to define the Cobra file to be assigned to the particular key field in Cobra. If the template does not have the required fields defined, the fields are enabled. Click to select a file to validate each key against for new projects.

If you are importing into an existing project or if a template containing these fields has been defined for the application, the fields in this column are populated and disabled.

Note: Cobra does not validate the Milestone and Note Categories fields.

Control Account Codes Tab

Use this tab to map imported data to codes on the Control Account field. This tab displays a grid with lines representing the code assignments associated with the selected project.

When creating a new project, the codes defined on the template project are displayed in the grid. If no code is defined for the selected project or if you are creating a new project where no template is defined, an error message that there are no work package codes defined for the project displays.

Field Description
Prompt

When importing into an existing project, the prompts for any predefined codes from the project information display in the grid.

Schedule Fields
Use the fields in this column to map fields in the schedule that contain the code assignment. You can either click to select a schedule field, or enter the name of the schedule field. An invalid schedule field results in an error.
Note: Ensure that you have selected Control Account and Work Package on the Action Selection page if work packages are assigned to the project.

Work Package Codes Tab

Use this tab to map imported data to codes on the Work Package field. This tab displays a grid with lines representing the code assignments associated with the selected project.

When creating a new project, the grid displays the codes defined on the template project. If no code is defined for the selected project or if you are creating a new project where no template is defined, an error message that there are no control account codes defined for the project displays.

Field Description
Prompt

When importing into an existing project, the prompts for any predefined codes from the project information display in the grid.

Schedule Fields

Use the fields in this column to map fields in the schedule that contain the code assignment. You can either click to select a schedule field or enter the name of the schedule field. An invalid schedule field results in an error.

Note: Ensure that you have selected Code Assignments and User Fields on the Action Selection page if codes are assigned to the project.

User Fields Tab

Use this tab to map schedule fields to the Cobra user fields. The User Fields grid displays the following columns.

Column Description
Cobra User Field This column displays the list of the Cobra user fields.
Schedule Field

Use this column to select a schedule field to map against the Cobra user field. You can either click to select a schedule field or enter the name of the schedule field. The User Character Fields [1-10] lookup dialog will only show text code fields defined in the schedule. The User Number Fields [1-10] lookup dialog box will only display numeric code fields defined in the schedule. The User Date Fields [1-10] lookup dialog box will only display date code fields defined in the schedule.

The User Fields grid displays only if you select Code Assignments and User Fields on the Action Selection page.

Note: You must first run the required script to display User Character Fields [6-10], User Number Fields [6-10], or User Date Fields [6-10]. Refer to Additional User Fields for instructions on how to configure Cobra to use these additional fields.
User Character Fields can be mapped to:
  • User Character Fields
  • Activity ID
  • Activity Codes
User Date Fields can be mapped to:
  • User Date Fields
User Number Fields can be mapped to:
  • User Number Fields
  • BAC Cost
  • BAC Quantity

The user fields will be imported from the current schedule regardless of baseline selection.