Save Graph Reports as XML Files

You can save some graph reports that you created from the Analyze Form as XML files. This option is available only for CV vs SV (Cost Variance vs Schedule Variance) graph report or the S, P, A, ETC curves graph report.

To use a specific template for the CV vs SV graph report, enter the location and filename for the new template in the CV-SV chart template file field in the Analyze section of the Preferences tab of the Project Properties dialog box.

To use a specific template for the S, P, A, ETC Curves graph report, enter the location and filename for the new template in the Curve chart template file field in the Analyze section of the Preferences tab of the Project Properties dialog box.

To save graph reports as XML files, complete the following steps:
  1. Run the Analyze utility.
  2. Create a graph report using the Analyze Form.
  3. Right-click the graph report and select Save Template on the shortcut menu.
  4. Select the folder where you want to save the graph report.
    You cannot navigate outside of the root folder displayed on the Save Template dialog box.
  5. Enter a name in the File name field and click Save.