Options Page of the Rolling Wave Wizard
Use this page to select the options for running the rolling wave process.
Contents
Field | Description |
---|---|
Rolling Wave Calendar | This field displays the rolling wave calendar assigned to the project. |
Periods prior to status date | Use this option to enter the number of periods prior to the status date that you want expand. The default value is one period prior to the status date. |
Periods following status date | Use this option to enter the number of periods following the status date that you wish to expand. The default value is three periods after the status date. |
Update the rate sets used with FTE result codes | Select this option to update rate sets used with the result code F. This allows full-time equivalents (FTEs) to be calculated correctly when looking at sub-periods versus period data.
You can update FTE rate sets even if you do not have write access to the rate file as long as you have permission to advance the calendar. |
How to...