Codes
For each control account and work package, you can assign 9 codes.
These codes are useful for reporting, sorting, filtering, integrating with a schedule, limiting what is considered in a Cobra process.
In addition to the 9 codes, you can assign a manager to the control account and work package. These can be used for reporting as well as in the workflow in PM Compass.
- Related Topics:
- Code Files
Typically, the first step a project manager must take is to define the scope of the project. In Cobra, this is accomplished using hierarchical coding systems designed for reporting at different levels of detail. These hierarchical coding systems are known as code files.
Parent Topic: Projects