Projects
A project is a collection of projects usually corresponding to a contract. A project in generic terms is a set of activities directed to an overall goal.
Cobra helps you manage projects; however, you open and perform data entry in a project and use the Explorer view and reports to manage at the project level.
- Related Topics:
- Control Accounts and Work Packages
In an EVMS environment, control points refer to points at which a piece of work is defined, scheduled, budgeted, and tracked. These control points are referred to as control accounts and, at a lower level, work packages throughout Cobra. - Progress Techniques
The progress technique selected for a work package determines how earned value is calculated. Earned value is used to measure the work package's performance. - Pending Dates
Cobra allows you to specify a set of start and finish dates for new and existing budget type classes that are not included in the budget. - Resource Assignments
Cobra project costs are entered as resource assignments. The list of resources that you can add are defined in the resource file. The resource file used for a project is defined on the Files tab of the Project Properties dialog box. - Milestones/Steps
If you select a progress technique of milestones or steps, you can define the milestones or steps within the work package. This allows you to have longer work packages and still objectively measure the progress within the work package. - Notes
For each control account and work package, you can assign an unlimited number of note categories. - Project View
Use the Project view to modify project data. - Project Properties Dialog Box
Use this dialog box to view or change information about a project. - New Project Wizard
The New Project wizard walks you through the process of creating a new project in Cobra. - Project Security
Use project security to control the individuals and groups who can access a project in Cobra. - Multiproject Operations (Master and Subprojects)
Multiproject operations allow you to work with a master project and any number of subprojects as though they were a single entity. - Standard Dialog Boxes and Procedures
Some standard dialog boxes and procedures are used throughout the Project view. - Basic Procedures
Some standard procedures are used throughout Cobra
Parent Topic: Cobra 8.2 Help System