Use this screen to generate a chart that displays Variance History for the project selected in the Navigation and all tasks below that level, summarized at the level selected. The Left Axis and Line graph the cumulative variance for Labor and Total Costs. The Right Axis and Bar graph shows total variance for each of the past 7 accounting periods.