Navigate Budgeting and Planning

To navigate Budgeting & Planning, refer to the following:

  1. In the navigation homepage, enter the Project ID directly into the project ID text box and click Find or click Enter on your keyboard.

  2. The application navigates to the project number entered and shows that structure in the project navigation list boxes.

bp_pm_navigate1.gif

  1. Or, click directly in the project navigation list boxes to find projects.

bp_navigate_2.gif

bp_navigate_3.gif

  1. Click the arrow  to navigate back to higher levels in the list box. Each click of the arrow moves you back to the next higher level.

  2. After selecting a project at the top level, click the View Project Structure icon  to open a tree- listing of all lower level project IDs, including titles.

bp_pm_navigate4.gif

  1. Click the magnifying glass  to open the Search Projects dialog box.

pm_navigate5.gif

  1. Click Select next to the project you want to see.

pm_navigate6.gif

  1. Click Reset Selections to remove the filter.

  2. Click Leave Window Open if you want the search grid to remain open after you have selected a project.

  3. Click the module with which you want to work. The module you click determines what options appear in the Reports & Actions field.

bp_pm_navigate7.gif

  1. Click the management context you want to use: Project, Organization, or Administrative.

  2. The context filters the information seen.

  3. The Project manager’s context emphasizes the project period-of-performance, the resources necessary to complete its tasks, available funds, costs and revenues.

  4. The Organization manager’s context emphasizes the accounting fiscal years. It integrates revenue and direct costs from an organization’s projects, along with its associated overhead costs (including allocations), to establish profitability.

  5. The Administrative context emphasizes the setup and modification of both project and organization management authority and responsibility as it relates to B&P users.

pm_navigate8.gif

  1. Select a report in Reports & Actions.

pm_navigate9.gif

  1. A brief description appears as your cursor hovers over a report name.

pm_navigate10.gif

pm_navigate11.gif

  1. 1st Letter — The first letter refers to the module you are in; in this example, Cost Analysis.

  2. 2nd Letter — The second letter refers to the management context you selected; in this example, Project Manager.

  3. 3rd Letter — The third letter refers to the level of the report; in this example, Level Down summarizes project information one level below the active level.

  4. A = Active Level

  5. C = Cost Performance Report

  6. I = Input (set up, input, audit, and approve)

  7. M = Maintenance

  8. S = Status (reviewing status of forecast process)

  9. T = Top Level (summarizing component information in WBS or OBS below)

  10. U = Upload (for importing data from another source)

  11. L = Level Down

  12. Number — Sequence ID

  13. Click a title to open a report. The report code, level (Top Lvl., Lvl. Down, Active Lvl.), and title are printed at the top of the report when it opens.

pm_navigate12.gif

  1. The contract/project information field gives pertinent information about the contract or project highlighted in project navigation.

pm_navigate13.gif

pm_navigate14.gif