Specify Valid WBS IDs

To specifying valid WBS IDs, complete the following steps:

  1. In Reports & Actions, select M.A.P.13 Specify Valid WBS IDs.

  1. Click to open the dialog box.

  2. Specify a valid WBS ID in the text box, and click Add. The application lets you know the ID was added and a list is created on the left. Just as a WBS structure can be established in your accounting system and reflected in the system, so can the WBS of a structured proposal be associated with project IDs and reflected in B&P.

  3. Click Delete to delete an entry.

  4. Click Close to close the dialog box. A WBS structure in the accounting system is a report specification, so multiple WBS structures can contain the same project/task ID.