To specify valid WBS IDs, complete the following steps:
In Reports & Actions, select M.A.P.13 Specify Valid WBS IDs.
The system default settings assume that you have not established alternate WBS reporting in your accounting system.
When WBS projects have been established, a formal request to Deltek support is required if you want all of them to be reflected in the system.
If you choose to import only selected WBS projects, use MAP13 to designate them.
If you choose to import all of them, MAP13 will be inactive.
Click to open the dialog box.
Specify a valid WBS ID in the text box, and click Add. The system lets you know the ID was added and a list is created on the left.
Just as a WBS structure can be established in your accounting system and reflected in the system, so can the WBS of a structured proposal be associated with project IDs and reflected in B&P.
Click Delete to delete an entry.
Click Close to close the dialog box.