Project Numbers in the Work Breakdown Structure
When you plan your work breakdown structure, you establish a project number structure.
Numbering Format
A project number, or the first level of your work breakdown structure, can be a total of 30 characters long, including two delimiters. The minimum length is three characters. You can also choose to have Ajera CRM supply leading zeros for all project numbers, which would pad numbers to the firm-wide length you establish during implementation.
- 4583
- 0005104-00
- CH.0415.871
For example, the project number, 12345.78, consists of five characters, followed by a period (.) delimiter in the sixth position, and ending with a two-character sub-number. This project number is a total of 8 characters long.
Project Templates
After your firm decides how to structure your WBS, project templates are an efficient way to ensure that projects created by users at your firm conform to this structure. Templates provide a baseline for new projects.
Project templates have a pre-defined work breakdown structure (WBS) and field values. You can modify them to meet the needs of individual projects.
You create project templates in
.