Acceleration Results Dialog Box
After running an acceleration, this dialog box displays the results.
Contents
The main area of the dialog box includes information about the project and the acceleration.
Field | Description |
---|---|
Do Not Add Scenario | Click to close the dialog box without adding the accelerated scenario to the project. |
Add Scenario | Click to add the accelerated scenario to the project.
The scenario that is added to the Projects pane includes the type of acceleration used and the target date or percentage target. |
Add Scenario and try another Script | Click to add the accelerated scenario to the project and display the Accelerate Schedule dialog box to run a new scenario.
The scenario that is added to the Projects pane includes the type of acceleration used and the target date or percentage target. |
Add Scenario and go to Forensics | Click to add the accelerated scenario to the project and display the Forensics tab.
The scenario that is added to the Projects pane includes the type of acceleration used and the target date or percentage target. |
Add Scenario and go to Diagnostics | Click to add the accelerated scenario to the project and display the Diagnostics tab with the 360 ribbon selected. If there is no 360 ribbon, the Diagnostics tab displays with the Scenario Comparison ribbon selected.
The scenario that is added to the Projects pane includes the type of acceleration used and the target date or percentage target. This is selected by default. |
Add Scenario and Trace Logic | Click to add the accelerated scenario to the project and display the S2 // Logic tab with trace logic performed to the activity that was the target of the acceleration.
The scenario that is added to the Projects pane includes the type of acceleration used and the target date or percentage target. |