IPMDAR Schedule Export Validations

When you export schedule data to an IPMDAR file, Acumen performs certain validations at the control account, work package, and task planning level.

Control Account / Work Package

  • When the control account ID is set to <WBS + OBS>, no warning displays for a summary task if either the WBS or OBS field value is blank. Summary tasks do not need to be assigned to a control account or work package.
  • When the work package ID for a task is not blank and the control account ID is blank, Acumen sets the work package ID to blank
  • The export does not fail for a summary task if the control account ID field value is blank, even if the work package ID field is set.

Task Planning Level

  • Acumen sets the Task Planning Level field to {Default} for a new export or workbook. This treats all schedule activities as planning level activities.
  • If the field that you assign to Task Planning Level is missing a value for a task, the value defaults to Activity. This does not include subproject tasks as their task subtype is not Activity.
  • When you assign a field for Task Planning Level, you only need values in the field when you want to override the default (that is, assign a value other than Activity).
  • A summary activity does not need to be associated with a Task Planning Level value.