This tab includes information about remaining cost, cost uncertainty, and risk notes.
Note: If you are working with duration uncertainty, then this tab is disabled.
Field/Option | Description |
Remaining Cost
|
This field displays the remaining cost for the selected item.
|
Probability of Existence
|
This field displays the probability, in percentage, that a cost is going to happen in your project. If you are not 100% certain that a cost is going to happen in your schedule, you can assign a probability to reflect this confidence level. You can either enter a percentage in this field or in the
% column on the S3 // Risk Activity grid.
|
Risk Notes
|
Use this text box to enter any additional notes about the activity risks. These notes are only available for reference on this tab and the Duration Uncertainty tab.
|